Some cracked steps, tight time schedule and no possibilities to transport the ladder to the workshop. Repairs were carried on board of the vessel. Cracked steps were showing metal fatigue, for a proper repair the steps were renewed with OEM new steps. After completion a load test was carried out under Class supervision.